{"id":58116,"date":"2026-06-23T11:57:54","date_gmt":"2026-06-23T15:57:54","guid":{"rendered":"https:\/\/adsknews.autodesk.com\/?post_type=stories&#038;p=58116"},"modified":"2026-06-23T12:04:49","modified_gmt":"2026-06-23T16:04:49","slug":"from-vision-to-foundation-progress-on-the-ground-in-altadena","status":"publish","type":"stories","link":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/","title":{"rendered":"From vision to foundation: progress on the ground in Altadena"},"content":{"rendered":"<div class=\"wp-caption\"><div id=\"attachment_58102\" style=\"width: 2504px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-58102\" class=\"wp-image-58102 size-full\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9.png\" alt=\"a man and woman looking at a construction site.\" width=\"2494\" height=\"1400\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9.png 2494w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9-300x168.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9-1024x575.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9-768x431.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9-1536x862.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9-2048x1150.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-9-700x393.png 700w\" sizes=\"auto, (max-width: 2494px) 100vw, 2494px\" \/><p id=\"caption-attachment-58102\" class=\"wp-caption-text\">A check-in from the Foothill Catalog Foundation&#8217;s March site visit.<\/p><\/div><\/div>\n<p>The Lewis stood framed against the Altadena sky as we surveyed the first Foothill Catalog construction site nearing completion on March 5, its structure taking shape exactly as it appeared in our catalog renderings months earlier.<span class=\"m-0 p-0 d-block c_6a3b2273526ec\">&nbsp;<\/span>Across Altadena, families were pacing lots where their future homes will soon rise. Cal Poly Pomona architecture students were hard at work volunteering on the latest Habitat for Humanity build site. The catalog designs we had developed as line drawings pinned to living room walls had transformed into lumber, concrete foundations, and the steady rhythm of construction crews at work.<\/p>\n<h3>Rebuilding at pace in a region under pressure<\/h3>\n<p>Across Los Angeles County, more than <a href=\"https:\/\/www.ca.gov\/lafires\/track-progress\/\">2,600 residential permits<\/a> have been issued between the Pacific Palisades and Altadena since the <a href=\"https:\/\/www.nytimes.com\/2026\/04\/15\/arts\/design\/los-angeles-fires-rebuilding-architecture-design.html?unlocked_article_code=1.bFA.-CgN.SoiQm13MmXAg&amp;smid=url-share\">January 2025 fires<\/a>, representing roughly one permit for every five of the nearly 13,000 homes lost. According to a <a href=\"https:\/\/www.mckinsey.com\/industries\/real-estate\/our-insights\/how-los-angeles-can-accelerate-recovery-after-the-2025-wildfires?utm_source=chatgpt.com\">McKinsey analysis<\/a>, Los Angeles would need to sustain an average peak rebuilding rate of 160 homes completed per month for roughly two years to rebuild half of the homes destroyed. <span class=\"m-0 p-0 d-block c_6a3b2273526f0\">&nbsp;<\/span>The first Foothill Catalog home, the <a href=\"https:\/\/www.foothillcatalog.org\/the-lewis\">Lewis model<\/a> built for the <a href=\"https:\/\/www.goodmorningamerica.com\/news\/story\/eaton-fire-recovery-six-months-123648687\">Wood family<\/a> in partnership with Habitat for Humanity San Gabriel Valley, represents the beginning of a growing movement that cannot be fully understood through statistics alone. Standing on that site in early March, we could see proof of what happens when design clarity meets coordinated execution. <span class=\"m-0 p-0 d-block c_6a3b2273526f2\">&nbsp;<\/span>The Foothill Catalog has now grown to contain over fifty pre-approved designs. Site-specific permitting is accelerating as many of them are immediately put to use with Altadena families. A collection of model homes will soon showcase the architectural variety that defines Altadena: the Elizabeth, a Tudor-style design; the Lexington, a three-bedroom craftsman; La Solana, a Spanish revival. Each one built to Very High Fire Hazard Severity Zone standards, all-electric, and designed to be both affordable and replicable.<span class=\"m-0 p-0 d-block c_6a3b2273526f3\">&nbsp;<\/span><\/p>\n<p><iframe loading=\"lazy\" title=\"Rediscovering Home: A Story of Altadena | Episode 1: After the Fire\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/r8agyeYL5cY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<h3>Connecting technology to decision-making<\/h3>\n<p>In the Foothill Catalog office that morning, homeowners were using extended reality (XR) walkthroughs powered by <a href=\"https:\/\/www.autodesk.com\/products\/workshop-xr\/overview\">Autodesk Workshop XR<\/a> to experience their future homes before breaking ground. Architectural drawings communicate structure and layout, but standing in a virtual kitchen where light moves across the counter, where you can sense how your family will move through the space, transforms an abstract plan into tangible reality. <span class=\"m-0 p-0 d-block c_6a3b2273526f4\">&nbsp;<\/span>This technology, recently highlighted in <a href=\"https:\/\/www.architecturaldigest.com\/story\/seven-grassroots-initiatives-working-to-support-la-families-and-rebuild-in-the-wake-of-last-years-fires?\">Architectural Digest&#8217;s<\/a> February 2026 feature on grassroots Los Angeles recovery efforts, addresses a fundamental challenge: most people don&#8217;t read buildings the way architects do. The gap between what appears on a blueprint and what someone experiences in their home creates hesitation, questions, and delays. Extended reality walkthroughs help collapse that distance. <span class=\"m-0 p-0 d-block c_6a3b2273526f5\">&nbsp;<\/span>Autodesk&#8217;s role centers on strategic coordination rather than software delivery alone. Autodesk has connected the Foothill Catalog with technical experts across our organization, partnerships that strengthen planning, permitting and rebuilding efforts, and provided the technology solutions that allow dozens of volunteer architects working across different locations to collaborate inside a unified digital environment. <span class=\"m-0 p-0 d-block c_6a3b2273526fa\">&nbsp;<\/span>For Autodesk, the engagement combines immediate community support with longer-term learning. What the Foothill Catalog is building, the system they&#8217;re creating around catalog designs and coordinated workflows, has potential application for disaster recovery globally. We&#8217;re studying how this model handles permitting velocity, how XR accelerates homeowner confidence, and how pre-approved designs compress timeline uncertainty. <span class=\"m-0 p-0 d-block c_6a3b2273526fb\">&nbsp;<\/span>The technology serves the mission. The mission always leads. <\/p>\n<h3>Accelerating recovery through design efficiency<\/h3>\n<p>The impact of pre-approved designs combined with coordinated digital workflows is most evident in permitting timelines. Permitting reviews that can traditionally stretch for months are now being streamlined, with eligible rebuild applications moving through local review in a matter of weeks. That compression, replicated across dozens of designs, changes recovery calculus. Traditional custom home design can take nine to twelve months before permits are submitted. Permitting itself typically requires at least another six months of review cycles. Pre-approved plans collapse at both stages. Families can move directly to contractor selection and site preparation rather than spending years navigating design and approval processes. <span class=\"m-0 p-0 d-block c_6a3b2273526fc\">&nbsp;<\/span>Autodesk&#8217;s contribution to this acceleration operates on three levels. First, our software enables volunteer architects scattered across different firms and cities to work inside the same Revit models, maintaining design consistency while distributing workload. Second, our Forma Data Management allows real-time collaboration between architects, structural engineers, and permitting consultants, reducing the version of control chaos that typically adds weeks to multi-party projects. Third, we are extending this work by connecting Foothill Catalog with partners who are supporting the development of neighborhood maps and community dashboards that can give residents, planners, and recovery partners a clearer view of rebuilding progress and community needs.\u00a0<span class=\"m-0 p-0 d-block c_6a3b2273526fd\">&nbsp;<\/span>Beyond the technical, Autodesk continues to expand our organizational support. We&#8217;ve deepened our investment in the Foothill Catalog&#8217;s operational capacity, providing resources that allow the foundation to scale from early-stage concept to sustained program delivery. This support extends across software access for their growing network of volunteer designers, technical training for staff managing increasingly complex digital workflows, and strategic connections to construction firms, material suppliers, and <a href=\"https:\/\/www.nytimes.com\/2026\/04\/15\/arts\/design\/los-angeles-fires-rebuilding-architecture-design.html?unlocked_article_code=1.bFA.-CgN.SoiQm13MmXAg&amp;smid=url-share\">philanthropic partners who can accelerate various dimensions of the rebuilding process<\/a>. <span class=\"m-0 p-0 d-block c_6a3b2273526fe\">&nbsp;<\/span>The result: a system where technology helps reduce friction at every handoff point. Designs move smoothly from concept to permit to construction, helping to avoid the communication breakdowns that normally slow recovery efforts.<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 50%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class=\"gallery galleryid-58116 gallery-columns-2 gallery-size-large\"><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-1024x575.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-1024x575.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-300x168.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-768x431.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-1536x863.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-2048x1150.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-1-700x393.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"568\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-1024x568.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-1024x568.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-300x167.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-768x426.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-1536x853.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-2048x1137.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-2-700x389.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-1024x577.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-1024x577.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-300x169.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-768x433.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-1536x866.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-2048x1154.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-7-700x394.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"568\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-1024x568.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-1024x568.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-300x166.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-768x426.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-1536x852.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-2048x1136.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-4-700x388.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"572\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-1024x572.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-1024x572.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-300x167.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-768x429.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-1536x857.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-2048x1143.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-6-700x391.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"573\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-1024x573.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-1024x573.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-300x168.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-768x430.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-1536x859.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-2048x1146.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-700x392.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"572\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-1024x572.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-1024x572.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-300x168.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-768x429.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-1536x858.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-2048x1144.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-3-700x391.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class=\"gallery-item\">\n\t\t\t<dt class=\"gallery-icon landscape\">\n\t\t\t\t<a href='https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8.png'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-1024x575.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-1024x575.png 1024w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-300x168.png 300w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-768x431.png 768w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-1536x862.png 1536w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-2048x1149.png 2048w, https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-8-700x393.png 700w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/>\n\t\t<\/div>\n\n<h3>Scale, visibility, and what comes next<\/h3>\n<p>As we move deeper into 2026, this work will expand across multiple tracks. Construction continues on dozens of homes, including model homes that will serve as physical references for families still evaluating their options. Additional catalog designs are entering the pre-approval pipeline. We&#8217;re exploring how Autodesk&#8217;s emerging AI capabilities can help automate code compliance checking across the hundreds of local regulations that govern residential construction in Los Angeles County, the average permit processing time from application to issuance still represents friction that technology can help reduce. <span class=\"m-0 p-0 d-block c_6a3b2273526ff\">&nbsp;<\/span>Autodesk is also testing how <a href=\"https:\/\/www.autodesk.com\/company\/autodesk-platform\/aec\">Forma<\/a>, the AECO industry cloud, can create unified digital workspaces where architects, builders, and permitting officials collaborate on the same project files in real time, reducing the version control chaos that typically slows multi-party coordination. Early pilots suggest that bringing all project documentation, 3D models, markup tools, and communication threads into a single environment can cut review cycles significantly. <span class=\"m-0 p-0 d-block c_6a3b227352702\">&nbsp;<\/span>But technology acceleration only matters if it serves families returning home. The tangible measures remain simple: permits issued, foundations poured, walls framed, families moving in. <span class=\"m-0 p-0 d-block c_6a3b227352703\">&nbsp;<\/span>When we stood on those construction sites in March, we saw frameworks rising where burned lots had sat empty for over a year. We saw a system becoming operational under conditions of real pressure, real constraint, and real emotional weight. <span class=\"m-0 p-0 d-block c_6a3b227352704\">&nbsp;<\/span>Collaboration and partnership have defined this recovery from its earliest days. Autodesk brought resources, strategic connections, and technical infrastructure. The Foothill Catalog brought community trust, design clarity, and the operational determination to turn concept into built reality. <span class=\"m-0 p-0 d-block c_6a3b227352705\">&nbsp;<\/span>Together, we&#8217;re demonstrating that recovery can move faster when design systems are pre-built, when technology reduces friction rather than adding complexity, and when partnership models distribute responsibility across organizations with complementary capabilities. <span class=\"m-0 p-0 d-block c_6a3b227352706\">&nbsp;<\/span>The foundations we&#8217;re building in Los Angeles are both literal and systemic: homes for families, and frameworks for how communities globally might rebuild after the next disaster.<span class=\"m-0 p-0 d-block c_6a3b227352707\">&nbsp;<\/span><\/p>\n<p><iframe loading=\"lazy\" title=\"Rediscovering Home: A Story of Altadena | Episode 2: The Catalog Home Reimagined\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/qKmDn-I0jxI?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<h3>Follow the journey<\/h3>\n<p>The complete rebuild lifecycle, from our March site visit through design development, permitting, and construction, is documented in <a href=\"https:\/\/www.autodesk.com\/design-make\/articles\/rediscovering-home-a-story-of-altadena\"><em>Rediscovering Home\u2013A Story of Altadena<\/em><\/a>, a new Autodesk.com video series. The first two episodes are now available, with more episodes to come. The series follows families, architects, and builders as they navigate the catalog model in practice, showing how pre-approved designs translate from digital files to physical homes.<span class=\"m-0 p-0 d-block c_6a3b227352708\">&nbsp;<\/span><em>To learn more about the Foothill Catalog Foundation and follow their progress, visit <a href=\"https:\/\/foothillcatalog.org\/\">foothillcatalog.org<\/a>. For more on Autodesk&#8217;s work in disaster recovery and resilient design, explore our AEC solutions at <a href=\"https:\/\/autodesk.com\/aec\">autodesk.com\/aec<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Foothill Catalog homes and digital tools help accelerate Altadena\u2019s wildfire recovery.<\/p>\n","protected":false},"author":80,"featured_media":58046,"template":"","categories":[3,4,6,5,376,513],"adsk_tags":[412,411,422],"class_list":["post-58116","stories","type-stories","status-publish","has-post-thumbnail","hentry","categories-aec-bim","categories-architecture","categories-construction","categories-engineering","categories-perspectives","categories-societal-impact","adsk_tags-collaboration","adsk_tags-connected-construction","adsk_tags-generative-design-aec"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.6 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Altadena wildfire recovery moves from plans to homes | Autodesk News<\/title>\n<meta name=\"description\" content=\"Altadena wildfire recovery advances as Foothill Catalog homes move from design to construction with Autodesk and digital tools supporting rebuilding.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From vision to foundation: progress on the ground in Altadena\" \/>\n<meta property=\"og:description\" content=\"Altadena wildfire recovery advances as Foothill Catalog homes move from design to construction with Autodesk and digital tools supporting rebuilding.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/\" \/>\n<meta property=\"og:site_name\" content=\"Autodesk News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/autodesk\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-23T16:04:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-1024x573.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"573\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/\"},\"author\":{\"name\":\"Nicolas Mangon\",\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/#\\\/schema\\\/person\\\/31c923860e4b8bfb1d3edd7965586817\"},\"headline\":\"From vision to foundation: progress on the ground in Altadena\",\"datePublished\":\"2026-06-23T15:57:54+00:00\",\"dateModified\":\"2026-06-23T16:04:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/\"},\"wordCount\":1345,\"image\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adsknews.autodesk.com\\\/app\\\/uploads\\\/2026\\\/06\\\/FHC-Image-5.png\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/\",\"url\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/\",\"name\":\"Altadena wildfire recovery moves from plans to homes | Autodesk News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adsknews.autodesk.com\\\/app\\\/uploads\\\/2026\\\/06\\\/FHC-Image-5.png\",\"datePublished\":\"2026-06-23T15:57:54+00:00\",\"dateModified\":\"2026-06-23T16:04:49+00:00\",\"description\":\"Altadena wildfire recovery advances as Foothill Catalog homes move from design to construction with Autodesk and digital tools supporting rebuilding.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#primaryimage\",\"url\":\"https:\\\/\\\/adsknews.autodesk.com\\\/app\\\/uploads\\\/2026\\\/06\\\/FHC-Image-5.png\",\"contentUrl\":\"https:\\\/\\\/adsknews.autodesk.com\\\/app\\\/uploads\\\/2026\\\/06\\\/FHC-Image-5.png\",\"width\":2502,\"height\":1400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/stories\\\/from-vision-to-foundation-progress-on-the-ground-in-altadena\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From vision to foundation: progress on the ground in Altadena\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/\",\"name\":\"Autodesk News\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/#\\\/schema\\\/person\\\/31c923860e4b8bfb1d3edd7965586817\",\"name\":\"Nicolas Mangon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/27ad619e202b9d2a89fb49459e7fa15353dbb23f411df998bc53d64d99ce38f0?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/27ad619e202b9d2a89fb49459e7fa15353dbb23f411df998bc53d64d99ce38f0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/27ad619e202b9d2a89fb49459e7fa15353dbb23f411df998bc53d64d99ce38f0?s=96&d=mm&r=g\",\"caption\":\"Nicolas Mangon\"},\"url\":\"https:\\\/\\\/adsknews.autodesk.com\\\/en\\\/author\\\/nicolas-mangon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Altadena wildfire recovery moves from plans to homes | Autodesk News","description":"Altadena wildfire recovery advances as Foothill Catalog homes move from design to construction with Autodesk and digital tools supporting rebuilding.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/","og_locale":"en_US","og_type":"article","og_title":"From vision to foundation: progress on the ground in Altadena","og_description":"Altadena wildfire recovery advances as Foothill Catalog homes move from design to construction with Autodesk and digital tools supporting rebuilding.","og_url":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/","og_site_name":"Autodesk News","article_publisher":"https:\/\/www.facebook.com\/autodesk\/","article_modified_time":"2026-06-23T16:04:49+00:00","og_image":[{"width":1024,"height":573,"url":"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5-1024x573.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#article","isPartOf":{"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/"},"author":{"name":"Nicolas Mangon","@id":"https:\/\/adsknews.autodesk.com\/en\/#\/schema\/person\/31c923860e4b8bfb1d3edd7965586817"},"headline":"From vision to foundation: progress on the ground in Altadena","datePublished":"2026-06-23T15:57:54+00:00","dateModified":"2026-06-23T16:04:49+00:00","mainEntityOfPage":{"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/"},"wordCount":1345,"image":{"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#primaryimage"},"thumbnailUrl":"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5.png","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/","url":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/","name":"Altadena wildfire recovery moves from plans to homes | Autodesk News","isPartOf":{"@id":"https:\/\/adsknews.autodesk.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#primaryimage"},"image":{"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#primaryimage"},"thumbnailUrl":"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5.png","datePublished":"2026-06-23T15:57:54+00:00","dateModified":"2026-06-23T16:04:49+00:00","description":"Altadena wildfire recovery advances as Foothill Catalog homes move from design to construction with Autodesk and digital tools supporting rebuilding.","breadcrumb":{"@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#primaryimage","url":"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5.png","contentUrl":"https:\/\/adsknews.autodesk.com\/app\/uploads\/2026\/06\/FHC-Image-5.png","width":2502,"height":1400},{"@type":"BreadcrumbList","@id":"https:\/\/adsknews.autodesk.com\/en\/stories\/from-vision-to-foundation-progress-on-the-ground-in-altadena\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adsknews.autodesk.com\/en\/"},{"@type":"ListItem","position":2,"name":"From vision to foundation: progress on the ground in Altadena"}]},{"@type":"WebSite","@id":"https:\/\/adsknews.autodesk.com\/en\/#website","url":"https:\/\/adsknews.autodesk.com\/en\/","name":"Autodesk News","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adsknews.autodesk.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/adsknews.autodesk.com\/en\/#\/schema\/person\/31c923860e4b8bfb1d3edd7965586817","name":"Nicolas Mangon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/27ad619e202b9d2a89fb49459e7fa15353dbb23f411df998bc53d64d99ce38f0?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/27ad619e202b9d2a89fb49459e7fa15353dbb23f411df998bc53d64d99ce38f0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/27ad619e202b9d2a89fb49459e7fa15353dbb23f411df998bc53d64d99ce38f0?s=96&d=mm&r=g","caption":"Nicolas Mangon"},"url":"https:\/\/adsknews.autodesk.com\/en\/author\/nicolas-mangon\/"}]}},"_links":{"self":[{"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/stories\/58116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/stories"}],"about":[{"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/types\/stories"}],"author":[{"embeddable":true,"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/users\/80"}],"version-history":[{"count":0,"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/stories\/58116\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/media\/58046"}],"wp:attachment":[{"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/media?parent=58116"}],"wp:term":[{"taxonomy":"categories","embeddable":true,"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/categories?post=58116"},{"taxonomy":"adsk_tags","embeddable":true,"href":"https:\/\/adsknews.autodesk.com\/en\/wp-json\/wp\/v2\/adsk_tags?post=58116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}